Bautech Industrial and Decorative Flooring
Other countries
Polish (Poland)English (United Kingdom)Russian (CIS)
Home page » Industrial » Systems & products » Hardened concrete floors » Accomplishments » Fire station

Garage, fire station flooring

Garage concrete floor

Garage - fire station. Dozen or so ton vehicles full of water are stationed here most of the time.

 

oil-proof

 

 

 

Hardened concrete flooring for large garage

 

Project name: Fire station interior

  

Technology: Hardened concrete flooring, brick-red colour

Building use: garage, rescue service parking place, repair garage

Contractor: Bautech

Year built: 2001

 

Reasons to build concrete floor in truck garage

Mass of vehicles that park here exceeds amounts commonly seen. Water filled fire truck may weigh over 20 tons. Hardened concrete slab sits directly on foundation and is reinforced with steel or polymer fibre - will withstand cosiderable burden.

Leakage - water, oil, break fluid. Industrial concrete floor is quite watertight, will not be penetrated by chemicals mentioned. When sealed with our sealers, will also resist detergents. 

How long does it take to build concrete floor? When pressed for time, concrete floor is ideal solution, as marble-like, pleasing to the eye surface layer is made together with pouring concrete. No need for separately laid finishing layer.

Reasonable pricing - dry shake topping concrete flooring is one of the cheapest solution for interiors over 200-500 sq.m.

 


 

VIDEO - how to build hardened concrete floor?

 

 

 

Need durable garage flooring? Hangar, station, car & truck parking or repair lot?

 

Ask

Koła bliźniaki pojazdu na posadzce betonowej

Two axles and twin tyres distribute load on slighly larger area, but both foundation and a slab are put to the test.

 

Ladder truck parked in a garage

30-meter ladder Man truck with auxiliary equipment. Bautech concrete floor stays still.

 

Metallic hardener bag

Extratop® metallic hardener was used for this project.

 

Filling joints in concrete

Final step of building process - joint filling with Bauflex® sealant.

 



Fire station garage 

Why hardened concrete flooring at a garage? Dynamic and static load strength, reasonable price, resistance to chipping, maintenance ease, quick construction process are main pros. Plus waterproof capability is crucial in garages and properly sealed concrete slab holds true here as well.

 

Tags: flooring, concrete, garage, fire station, ladder truck

  

  OUR CLIENTS

  • logos_01-07.jpg
  • logos_02-06.jpg
  • logos_03.jpg
  • logos_04-05.jpg
  • logos_04.jpg
  • logos_05.jpg
  • logos_06.jpg
  • logos_11.jpg
  • logos_12.jpg
  • logos_17.jpg
  • logos_19-19.jpg
  • logos_19-23.jpg
  • logos_19-24.jpg
  • logos_19.jpg
  • logos_21.jpg
  • logos_22.jpg
  • logos_26.jpg
  • logos_27-32.jpg
  • logos_27.jpg
  • logos_29-34.jpg
  • logos_29.jpg
  • logos_30.jpg
  • logos_36.jpg
  • logos_38.jpg
  • logos_39-43.jpg
  • logos_39.jpg
  • logos_40.jpg
  • logos_42.jpg

Call Phone +48 22 716 77 91

Contact details

© 2019 All right reserved. BAUTECH sp. z o.o. ul. Staszica 25, 05-500 Piaseczno k. Warszawy tel. 22 716-77-91, fax 22 716-77-90, NIP 522-000-09-96, Regon: 012547108, KRS nr 0000166495 Sąd Rejonowy dla m.st. Warszawy, XIV Wydział Gospodarczy KRS, share capital: 51 000 PLN, bank account PKO BP S.A. 57 1020 1068 0000 1502 0146 4957

project by: Intermedium.pl interactive agency