Project name
|
Floor technology
|
Investor / General contractor
|
Floor area
|
Year built |
|
Museum - Palmiry state monument in Kampinoski National Park, Warsaw environs
|
Bautop® hardened concrete floor
|
Stołeczny Zarząd Rozbudowy Miasta (Warsaw City Development Board) / Winnicki
|
approx. 1000 m2
|
2011
photos
|
|
 |
Mountain store
|
Hardened concrete floor (ground level) + Baufloor® screed (2nd floor)
|
Snap Outdoor
|
300 m2
|
2014
photos
|
|
 |
Large garage
|
Multitop® Enduro hardened concrete flooring
|
-
|
1 600 m2
|
2014
photos
|
|
 |
Ibis Styles hotel
lobby, restaurant
|
Hardened concrete floor, grinded, titanium-grey
|
Accor Hotels
|
-
|
2014
photos
|
|
 |
Bi-level underground parking
Pacific Office Building
|
Hardened concrete floor
|
Kronos Pacific
|
-
|
2014
Photos
|
|
 |
Sanitary wholesaler
warehouse
|
Hardened concrete flooring
|
SBS Group
|
2 500 m2
|
2014
photos
|
|
 |
Cosmetics factory
warehouse
|
Multitop® hardened concrete flooring
|
-
|
500 m2
|
2014
photos
|
|
 |
Maxi Zoo pet shop
|
Hardened concrete surface, platinum
|
Maxi Zoo
|
-
|
2014
photos
|
|
 |
KaVis Bakery & Confectionery factory
warehouse
|
Hardened concrete surface, grey
|
KaVis
|
-
|
2014
photos
|
|
 |
Skatepark
|
Hardened concrete surface, Multitop® Enduro hardener, graphite
|
Naklo community
|
400 m2
|
2014
photos
|
|
 |
Fruit processing plant
|
hardened concrete floor, natural grey
|
Soska Fruit & Vegetables / Budrem
|
10 000 m2
|
2013
photos
|
|
 |
Town ice rink
Chipped and pitted slab repair
|
Terrafill® two component repair mortar
|
Kozienice town
|
2 000 m2
|
2013
photos
|
|
 |
Feed mixing facility, Krosno, Pasłęk municipality
|
DST, grey coloured
|
Wipasz
|
2 500 m2
|
2012
photos
|
|
 |
Foodstore front and backroom (the butcher's, fishmonger's, bakery)
Cash&carry supermarket + backroom
|
Multitop® hardened concrete floor
|
Goodwill
|
8500 m2
|
2012
photos
|
|
 |
Decathlon sports shop, Rumia
Sports shop, exhibition and storage space
|
DST hardened concrete floor
|
Decathlon / Petrobud
|
3000 m2
|
2012
photos
|
|
 |
CeNT II, CeNT III (Science & Technology center), University of Warsaw
Underground garage
|
Multitop® Enduro
|
Karmar S.A. (general contractor) / Chemobud Puławy (subcontractor)
|
5 000 m2
|
2011
photos
|
|
 |
Amphitheatre
Auditorium, hall
|
Multitop® hardened concrete floor
|
-
|
-
|
2011
photos
|
|
 |
Pittsburgh Glass Works
Automotive glass manufacturing plant, Środa Śląska / Komorniki
|
Bautop® hardened concrete floor
|
POLIMEX MOSTOSTAL S.A.
|
hall 20 000 m2
|
2011
photos
|
|
 |
Refrigerator room, Warka, Poland
Fruit cooler room
|
DST concrete floor
|
- / Lemaro (contractor)
|
2 000 m2
|
2011
photos
|
|
 |
Supermarket storeroom
Supermarket backroom
|
DST concrete floor
|
|
2 400 m2
|
2011
photos
|
|
 |
Warehouse, Kazakhstan
High bay warehouse
|
DST concrete floor
|
Polystyrene manufacturing plant, Kaptshaagaj / TOO NKM, Alma-Ata
|
3 500 m2
|
2011
photos
|
|
 |
Manufacturing hall, Kazakhstan
|
DST concrete floor
|
Polystyrene manufacturing plant, Kaptshaagaj / TOO NKM, Alma-Ata
|
3 000 m2
|
2011
photos
|
|
 |
ALUMETAL
Scrap aluminium processing plant, cast alloys manufacturer, Nowa Sol, Poland
|
Bautop® and Extratop® hardeners for concrete floors
|
Lubuskie Przedsiębiorstwo Budownictwa Przemysłowego PROJPRZEM |
Hall 18 000 m2
|
2011
photos
|
|
 |
APATOR electrotechnics equipment manufacturing plant, Torun
|
Multitop® i Bautop® DST hardeners for concrete
|
MARBUD
|
10 000 m2
|
2011
photos
|
|
 |
Goodwill hypermarket, Tbilisi, Georgia
Supermarket hall
|
Bautop® Enduro hardener for DST floors
|
|
4 000 m2
|
2010
photos
|
|
 |
Energy-efficient Housing Estate, Gdańsk Osowa
Underground garage
|
Multitop® hardened concrete floor
|
Towarzystwo Ziemskie Sp. z o.o.
www.towarzystwo.pl
|
4 500 m2
|
2011
photos
|
|
 |
Film studio, Piaseczno, Warsaw environs
Scenery
|
Multitop® DST engraved concrete floor
|
Chronos Film / Artbeton s.c.
|
approx. 1000 m2
|
2001
photos
|
|
|
TRW Steering Systems Poland Sp. z o.o., Bielsko-Biala, Konwojowa St.
Manufacturing plant
|
Bautop® Enduro, anti electrostatic floor
|
TRW Steering Systems Poland Sp. z o.o. / PUT "RABA II" Sp. z o.o., Jaworzno
|
16 000 m2
|
2011
See
|
|
|
Produce warehouse, Stara Warka
|
DST (Bautop®), natural grey
|
Farmers / ROSA HALE Sp. z o.o.
|
3 000 m2
|
2012 |
|
 |
Waste recycling center, Warsaw, Kampinoska St.
|
DST (Bautop®), natural grey
|
MPO / Go-Bud
|
3 200 m2
|
2012 |
|
|
Palace Residence, Warsaw, Wilanow
Estate garages
|
DST, natural grey
|
Private / STRABAG
|
600 m2
|
2012 |
|
|
Fruit processing plant, Nowe Sadkowice
|
DST, natural grey
|
Private / Budrem
|
1500 m2
|
2012 |
|

|
Bilogical waste storage site, Resko
Warehouse hall
|
DST concrete slab
|
Zakład Usług Budowlanych i Komunalnych / -
|
300 m2
|
2012 |
|
|
Shop and Warehouse, Kruszyn, Szkolna St.
|
DST, natural grey
|
F.H.U.T Rosiński Sławomir
|
300 m2
|
2012 |
|
|
Warehouse, Gorzow Wlkp., 25 Walczaka St.
Zakład przemysłu chemicznego
|
DST, natural grey
|
RHODIA Polska / Pal-Gaz
|
1000 m2
|
2012 |
|
|
Air hangar, PZL Mielec
|
DST, anti static floor
|
PZL Mielec / Budirem
|
3000 m2
|
2012 |
|
|
Warehouse, Bielsko-Biala, Bestwinska St.
|
DST, natural grey
|
Polmotors / Polmotors
|
1 600 m2
|
2012 |
|
|
Warehouse, Pogorzela
|
DST, natural grey
|
Bracik Bros. / Thermolux
|
1 000 m2
|
2012 |
|
|
Garage hall, Warsaw, Rzeczpospolitej Av.
|
DST, grey
|
Budizol / Budizol
|
2 000 m2
|
2012 |
|
|
R&D Park extension, Torun, 167 Wroclawska St.
|
concrete slab reinforced with Baumix® steel fibre
|
Toruńska Agencja Rozwoju Regionalnego SA / Budimex SA
|
6 600 m2
|
2012 |
|
|
Szczecin Concert Hall, Malopolska St.
|
concrete slab reinforced with Baumix® steel fibre
|
Szczecin City Hall / Warbud SA
|
approx. 5 000 m2
|
2012 |
|

|
Alumetal SA manufacturing plant extension
Scrap aluminium recycling center plus cast iron manufacturing, Nowa Sol
|
DST, grey
|
Alumetal SA / Projprzem Sp. z o.o.
|
approx. 2 500 m2
|
2012 |
|
|
Nordzucker Polska SA factory, Opalenica
Manufacturing shop with calcareous stove
|
DST concrete floor, grey
|
Nordzucker Polska SA / Energomontaż Zachód Wrocław Sp. z o.o.
|
350 m2
|
2012 |
|
|
Festo Industrial Automatics, Garwolin
Factory
|
Bautop® Enduro DST floor, natural grey
|
Festo / Monstal
|
3 200 m2
|
2012 |
|
|
Roto Frank Skylight Sp. z o.o., Lubartów
Factory
|
Multitop® Enduro DST, natural grey
|
Roto / Skanska
|
2 000 m2
|
2012 |
|
|
Joko Cosmetics sp.j., Wołomin
Manufacturing plant
|
Multitop Enduro DST floor, natural grey
|
|
3 000 m2
|
2012 |
|
|
Andersia Business Center, Poznan
Office block underground garage
|
DST concrete floor
|
Andersia Business Center / PORR Polska
|
3500 m2
|
2012 |
|
|
Skate Park, Jaslo
Skateboarding and roller skate park
|
DST concrete paving
|
Jasło City / Mek Bud Tarnów
|
700 m2
|
2012 |
|
|
TBS Ostrołęka, Jana Pawła II St.
Underground garage
|
DST olive and grey
|
- / ABC Ostrołęka
|
1300 m2
|
2012 |
|
|
Wejherowo Concert Hall
Underground garage
|
DST concrete floor
|
Wejherowo City / Eiffage-Mitex
|
700 m2
|
2012 |
|
|
Orzeł Biały SA Steelworks
Maintenance station, warehouse, Piekary Śląskie
|
DST concrete floor
|
KPB Katowice / KPB Katowice
|
800 m2
|
2012 |
|
|
Decathlon sports shop, Rumia, Grunwaldzka St.
Store backroom
|
DST concrete floor
|
Petrobud / Petrobud
|
3 000 m2
|
2012 |
|
|
Centralpark Housing Estates by Hossa, Gdańsk, Piecewska St.
Parking garage
|
DST concrete flooring
|
Bauhaus / Bauhaus
|
5 000 m2
|
2012 |
|
|
ATM Grupa SA, film & TV producer, Bielany Wrocławskie
film studio
|
DST Extratop® concrete floor
|
ATM / -
|
1 000 m2
|
2012 |
|
|
Academy of Fine Arts, Łódź
studio
|
Bautech Formula®
|
ASP / Budimex
|
3 000 m2
|
2012 |
|
|
Novamedia Innovision Sp. z o.o., Kalisz
recording studio
|
DST concrete floor
|
Novamedia / Antczak
|
2 500 m2
|
2012 |
|
|
TROPS S.A. building materials wholesaler, Torun
Building materials warehouse
|
DST concrete floor
|
TROPS / FB Fijałkowski i S-ka
|
1 600 m2
|
2012 |
|
|
BMW - MINI dealership, Smorawiński, Poznan
garage
|
DST concrete floor
|
Smorawiński / STRABAG
|
1 900 m2
|
2012 |
|
|
RABEN office block, Gądki, Poznan environs
garage
|
DST concrete flooring
|
RABEN / Skanska
|
480 m2
|
2012 |
|
|
Ełk Technology Park
shop
|
DST industrial floor
|
- / Henpol
|
2 000 m2
|
2012 |
|
|
Warehouse, Baniocha
|
DST industrial floor
|
Rad Bud (contractor)
|
1 000 m2
|
2012 |
|
|
Multimedia center, Nowy Sącz Technology Park
garage
|
DST concrete paving
|
- / Rebau
|
1 000 m2
|
2012 |
|
|
Sante warehouse, Sobolew near Garwolin
|
DST concrete floor
|
Sante / Majsterek (contractor)
|
8 000 m2
|
2012 |
|
|
Warehouse, Sędziszów, Spółdzielcza St.
|
DST industrial flooring
|
private / Bekir (contractor)
|
1 000 m2
|
2012 |
|
|
Warehouse, Baniocha, Warsaw environs
|
DST industrial floor
|
Rad Bud (contractor)
|
1 000 m2
|
2012 |
|
|
Chicken coop, Ujazdówka near Ciechanów
farm building
|
Bauseal® impreganted concrete slab
|
Cedrob / Stargosbud
|
5 000 m2
|
2012 |
|
|
Warehouse, Warka, Puławska St.
|
DST concrete floor
|
Centrostal / Lemaro (contractor)
|
1 000 m2
|
2012 |
|
|
Krzysztof Penderecki European Music Center, Lusławice
museum
|
DST concrete floor
|
Bekir (contractor)
|
1 000 m2
|
2012 |
|
|
Parking garage, Kraków, Agrestowa St.
|
DST concrete floor
|
- / AEDES
|
1 000 m2
|
2012 |
|
|
Parking garage, Piaseczno, Sienkiewicza St.
|
DST concrete floor
|
- / PID Developer
|
1 000 m2
|
2012 |
|
|
Warehouse, Częstochowa, Wielkopiecowa St.
|
DST industrial floor
|
Birex / Bekir (contractor)
|
2 000 m2
|
2012 |
|
|
Parking garage, Józefosław, Warsaw environs
|
DST concrete floor
|
Rad Bud (contractor)
|
3 000 m2
|
2012 |
|
|
Parking garage, Warsaw, Wilanów
|
DST concrete floor
|
Polnord / Pol Aqua S.A.
|
4 000 m2
|
2012 |
|
|
Steel constructions manufacturing company, Folwark Koplany, Juchnowiec Kościelny municipality
|
DST concrete floor
|
Durobex (contractor)
|
3 000 m2
|
2012 |
|
|
Parking garage, Ostrołęka
|
DST industrial flooring
|
Mixbet (contractor)
|
3 000 m2
|
2012 |
|
|
Warehouse, Lipsko, Armii Krajowej St.
|
DST concrete flooring
|
Perofest (contractor)
|
500 m2
|
2012 |
|
|
Warehouse, Józefów Sad, Urzędowska St.
|
DST concrete floor
|
Budex (contractor)
|
2 500 m2
|
2012 |
|
|
Białystok Heat and Power Station
biomass storage site
|
concrete slab reinforced with Baumix® steel fibre
|
Białystok Heat and Power Station / Hochtief
|
4 000 m2
|
2012 |
|
|
Airport fire station, Gdansk
Fire station garage, L. Wałęsa Airport
|
DST concrete floor
|
Gdansk Airport / Przembud
|
900 m2
|
2012 |
|
|
Maize storage site, Pasłek, Miedzyrzecz Podlaski
produce storeroom
|
DST concrete floor
|
Wipasz / Wipasz
|
6 000 m2
|
2012 |
|
|
Warehouse, Warsaw, Baletowa St.
|
DST concrete floor
|
Private investor /
System Piotr Postolski
|
1 000 m2
|
2012 |
|
|
Undergorund garage, Gdańsk, Nowosądecka St.
|
DST concrete floor
|
Budros / Budros
|
900 m2
|
2012 |
|
|
PZL - EADS Warszawa Okęcie SA warehouse,
Warsaw, Krakowska Av.
|
DST concrete floor
|
PZL / Eurodom
|
2 700 m2
|
2012 |
|
|
Parking garage, Jabłonna, Strumykowa St.
|
DST concrete pavement
|
- / Henpol
|
3 000 m2
|
2012 |
|
|
Parking garage, Kraków
|
DST concrete floor
|
MDM / MDM
|
10 000 m2
|
2012 |
|
|
Underground parking garage, Gdańsk, Generała Słabego St.
|
DST concrete floor
|
Krj Partner / Krj Partner
|
2 000 m2
|
2012 |
|
|
Underground garage, Gdańsk, Toruńska St.
|
DST concrete floor
|
Mill-Yon Sp. z o.o. / Mitex
|
2 000 m2
|
2012 |
|
|
Słasino Regional Waste Management Center, Nowogard municipality
parking site and drives
|
concrete slab reinforced with Baumix® steel fibre
|
Celowy Związek Gmin R - XXI / BUDIMEX S.A.
|
30 680 m2
|
2012 |
|
|
Multi-family residential building, Warsaw, Dalanowska St.
Underground garage
|
Multitop® Enduro concrete floor
|
Unibep S.A.
|
3 000 m2
|
2011 |
|
|
Multi-family residential building, Warsaw, KEN Av.
Underground garage
|
Multitop® dry shake topping floor
|
DOM 2000 / Tynkbud 1
|
500 m2
|
2011 |
|
|
Hotel, Warsaw, Bitwy Warszawskiej 1920 St.
Underground garage
|
Multitop® Enduro dry shake topping floor
|
Hotel Etap & Ibis / Warbud S.A.
|
10 000 m2
|
2011 |
|
|
Kaskada shopping mall, Szczecin, Obrońców Stalingradu St.
Staircase
|
Baucon® poliprophylene fibre reinforced floor
|
ECE Polska / Strabag
|
43 000 m2
|
2011 |
|
|
Manufacturing plant, Olsztyn
|
Baumix® 60 steel fibre reinforced floor
|
private investor / private contracting
|
3 000 m2
|
2011 |
|
|
Szperk shopping mall, Gdynia, 338 Płk. Dąbka St.
|
Baumix® 60 steel fibre reinforced floor
|
UBM Polska Sp. z o.o. / Budownictwo Wojnarowscy (contractor)
|
19 000 m2
|
2011 |
|
|
Panorama Park Housing Estate, Kalisz, H. Sawickiej St.
Underground garage
|
Baumix® 60 steel fibre reinforced floor
|
F.B. "Marek Antczak" / F.B. "Marek Antczak"
|
5 500 m2
|
2011 |
|
|
Ostrołęka Police Headquarters, Goworowska St.
garage
|
Baumix® 60 steel fibre reinforced floor
|
KWP / PBK Sp. z o.o.
|
1 000 m2
|
2011 |
|
|
Mennica Polska mint, Radzymin
|
Bautop® Enduro concrete floor
|
Mennica Polska / Bet - Bruk Sp. z o.o. (contractor)
|
2 000 m2
|
2011 |
|
|
CeNT II, CeNT III, Warsaw, Grójecka St. (New technologies center)
garage
|
Multitop® Enduro concrete floor
|
Karmar S.A. (general contractor) / Chemobud Puławy (contractor)
|
5 000 m2
|
2011 |
|
|
Izba Skarbowa i Urząd Skarbowy, Lublin (Inland Revenue Office), Smorawińskiego St.
|
DST concrete floor
|
Budimex SA (general contractor)
|
3 000 m2
|
2011 |
|
|
Warehouse, Częstochowa, Żyzna St.
|
Multitop® Enduro concrete floor
|
BOJANEK / BEKIR (contractor)
|
2 000 m2
|
2011 |
|
|
Produce storeroom, Warka, Budy Opożdżewskie
|
Multitop® Enduro concrete floor
|
private investor / Kerim (contractor)
|
1 000 m2
|
2011 |
|
|
Fat smelting & crackling drying plant, Lubień Kujawski
|
Multitop® Enduro concrete floor
|
private investor / Budizol sp. k.
|
1 400 m2
|
2011 |
|
|
Multi-family multi-storey residential building, Warsaw, Marywilska St.
Underground garage
|
Multitop® concrete floor
|
MANN INWESTYCJE Sp z. o.o (investor and contractor in one)
|
1 100 m2
|
2011 |
|
|
Cement mill, Górażdże Cement Works, Cementowa St.
manufacturing space
|
Bautop® Enduro concrete floor
|
Gpbo S.A (general contractor)
|
900 m2
|
2011 |
|
|
"Ogrody Hallera" Housing Estate, Wrocław, Gen. J. Hallera Av.
garage
|
Multitop® Enduro concrete floor
|
ARCHICOM / WROBIS
|
1 900 m2
|
2011 |
|
|
Pustułeczki Housing Estate, Warsaw, Pustułeczki St.
Garage
|
Multitop® concrete floor
|
Mostostal SA (general contractor)
|
1 500 m2
|
2011 |
|
|
Woodward factory, Niepołomice (energetics control systems)
manufacturing space
|
Bautop® Enduro concrete floor
|
Woodward Niepołomice / RD bud Sp. z o.o.
|
1 000 m2
|
2011 |
|
|
Buma Group, Kraków
manufacturing hall
|
concrete slab reinforced with Baumix® steel fibre
|
Buma Group
|
2 000 m2
|
2011 |
|
|
NOMI Home Center, Dębica
warehouse
|
DST concrete floor
|
BUDPIS (contractor)
|
5 000 m2
|
2011 |
|
|
Parking site, Mińsk Mazowiecki, Warszawska St.
|
Multitop® concrete paving
|
GMK (contractor)
|
2 000 m2
|
2011 |
|
|
AGORA SA printing-house, Warsaw, Daniszewska St.
warehouse
|
Bautop® Enduro floor
|
AGORA SA / Marokat
|
700 m2
|
2011 |
|
|
Housing estate, Warsaw, Włodarzewska St.
parking site
|
Multitop® concrete slab
|
Warbud (gen. wyk.) / Totalbud (wyk. posadzki)
|
4 000 m2
|
2011 |
|
|
Production shop, Lublin, enerprise zone, Vetterów St.
|
Multitop® Enduro concrete floor
|
Amibet (contractor)
|
1 500 m2
|
2011 |
|
|
Frito Lay Polska, Sobolew near Garwolin
production shop
|
Multitop® Enduro concrete floor
|
FRANKOWSKI (general contractor) / Majsterek (contractor)
|
5 000 m2
|
2011 |
|
|
Villa Arte apartment block, Warsaw, Jana Kazimierza St.
underground garage
|
Multitop® concrete floor
|
Bouyuges Immobilier Polska / Budimex SA
|
4 000 m2
|
2011 |
|
|
Garage, Kielce
|
Multitop® Enduro concrete floor
|
Probud 1 (general contractor) / Lemaro (contractor)
|
700 m2
|
2011 |
|
|
Puławy Port, Portowa St.
port watchtower
|
Extratop® Enduro floor
|
Mota-Engil Polska SA (gen. wyk.) / Dombud Puławy (wyk. posadzki)
|
300 m2
|
2011 |
|
|
Fortec Paint and Varnish factory, Stęszew (Kostrzyńsko-Słubicka enterprise zone)
production shop
|
Bautop® Enduro dry shake topping floor
|
Partner (general contractor) / Pal Gaz (contractor)
|
3 000 m2
|
2011 |
|
|
CASTORAMA Home Center, Białystok, Narodowych Sił Zbrojnych St.
|
Multitop® Enduro concrete floor
|
Agmet (general contractor) / Spectrum (contractor)
|
9 000 m2
|
2011 |
|
|
Estal Paint Shop, Mników, Morawica
paint shop room
|
Multitop® Enduro concrete industrial floor
|
Bekir (contractor)
|
1 500 m2
|
2011 |
|
|
LASERSTAR Laser Processing Center. Toruń
manufacturing hall
|
Multitop® Enduro concrete floor
|
LASERSTAR / CRITPLAN
|
4 000 m2
|
2011 |
|
|
Leather car upholstery manufacturing plant, BADER Polska, Bolesławiec, Modłowa St.
sewing room
|
Bautop® Enduro
|
BADER Polska / POLIMEX MOSTOSTAL
|
2 000 m2
|
2011 |
|
|
Goleniów sewage farm, Matejki St.
Sediment storage pool
|
Bautop® Enduro concrete slab
|
Przedsiębiorstwo Gospodarki Komunalnej / EKOKLAR Piła
|
3 000 m2
|
2011 |
|
|
Mult-family residential buildings, Warszawa, Bartycka St.
Underground garage
|
Multitop® concrete floor
|
Karmar S.A.
|
2 500 m2
|
2011 |
|
|
Multi-family residential building, Łódź
|
Multitop® concrete floor
|
Emerald Construction And Property Development / ŁUCZ-BUD
|
2 500 m2
|
2011 |
|